From Lift-off to Nosedive: Probe Panel Report Explains Why ISRO’s EOS-03 Satellite Mission Failed According to the Failure Analysis Committee, there was an abnormal pressure build-up in the LH2 tank just after the rocket lifted off, impacting the mission success